Commercial
Click on the album below to view the Case Study for each project.
7 Story High Rise
Aircraft Hangar Phase1
Aircraft Hangar Phase2
Barn Conversion
Sound Control Mezzanine
Charter School
Fire Hall - Ice Damming
Strip Mall
Detailed Architectural Framing
Concrete Batch Plant
Library - Sound Control
Strip Mall - Energy Efficiency
Church-Remodel After Fire
Church - Air Sealing
Condensation & Mold Issues
For Case Studies specific to Metal Buildings, click on the thumbnail.

















